Skip to main content
Exterior works
- Removal of all Georgian wired roof lights to main roof
- Recladding of parts of the existing main roof
- Reline all gutters
- Re felt office roofs
- Recladding of east and west elevations
- Repairs and redecoration of steel walkways
- Civil work and replacement drains on railway side
- Structural work to brickwork throughout
- Paint all steel windbreakers around site
- New palisade fencing all round site
Internal works
- Removal of all asbestos throughout site.
- Remove all redundant wiring and cable replacing with new.
- Replacing new distribution boards
- Rewire 2 internal 50 tonne cranes
- Removal of a 30 tonne crane
- Repair concrete floors and repaint
- 2 new roller shutter doors
- New lighting package throughout all 3 warehouses
- Replace new mains board switchgear
- Install new alarm system