Skip to main content

Full refurbishment and split into single units.

 

Exterior works

  • Re cladding of roof front back and side elevations
  • Install 4 separate water mains 
  • New concrete slaps to form front elevation

 

Internal works

  • Full M&E package i.e new lighting and distribution boards thought the builds and new individual heating systems
  • Dividing walls constructed to separate units with block, jumbo stud, tape and jointed
  • Full decoration thought building
  • Floors Diamond grind and finish with grey resin paint
  • PVC package to front elevation
  • New concrete slabs forming to front elevation